Brewery Build - Progress

Unfortunately my wife, Sarah had a resurgence of a trapped nerve problem she had last year and had to spend a few days in hospital so I'm a bit behind schedule on the brewery.

The floor is done and I've now sorted out a stable type door for it. It's amazing what you can make with a couple of packs of bargain floorboards.

Top bit of door and the finished floor with fully functional floordrain.

Pretty much finished, there's now a drip strip that covers the gap along the bottom of the top door.

A well deserved pint of what I'm calling Vieux Sanglier (Old Boar).